Heavy Industry

Shipbuilding

Ocean Engineering

Renewables

Shipbuilding

No drawings, no 3D modelers.

Automatically match the optimal welding sequence and welding parameters.

Improve overall efficiency by 40%.

Reduce the workforce by 37%.

Ocean Engineering

World first.

The same welding position area includes flat, vertical and vertical forming at one time, and the difficulty of multi-layer multi-channel groove welding is the most difficult in the world.

The longest span in the world is 26.5 meters.

Adaptive programming software system.

Heavy Industry

Intelligent manufacturing from workpiece blanking to delivery.

IoT + 5G technology.

Increase comprehensive production capacity by 37%.

Reduce the workforce by 75%.

Adaptive Offline Programming System

Automatic calculation of workpiece coordinate system position

Can automatically adapt to the dimensional changes of the workpiece

Automatic correction of workpiece placement

Quick and automatic generation of multiple welds, automatic sorting

Get in touch