No drawings, no 3D modelers.
Automatically match the optimal welding sequence and welding parameters.
Improve overall efficiency by 40%.
Reduce the workforce by 37%.
World first.
The same welding position area includes flat, vertical and vertical forming at one time, and the difficulty of multi-layer multi-channel groove welding is the most difficult in the world.
The longest span in the world is 26.5 meters.
Adaptive programming software system.
Intelligent manufacturing from workpiece blanking to delivery.
IoT + 5G technology.
Increase comprehensive production capacity by 37%.
Reduce the workforce by 75%.